System Builder and System Installation Plant References
Hot Water Heater Capacity 5000L Skid and piping installation (Yamamori -Rayong)
Skid Steam Transformer Capacity 30 tons at 3.5 bars and installation (E-SAAN SUGAR - Kalasin)
3 Effects for refine sugar Capacity 150 m3/h ( Surin Sugar - Surin )
Modified 3 effects Evaporator of NaoH 32-> 50% Capacity 259.2 tons/h (AGC chemical -Prapadaeng)
Methanol recovery system Capacity 985 kg/h at 99.95 % methanol
(Absolute Power - Rayong)
Absolute Power P CO.,LTD.
Project : WATER AND METHANOL RECOVERY